留矿法采后间柱回采方法优化研究  被引量:2

Mining method optimization of pillar in shrinkage method

在线阅读下载全文

作  者:董宪久 

机构地区:[1]广西中金岭南矿业有限责任公司,广西武宣545900

出  处:《中国矿业》2016年第5期78-81,共4页China Mining Magazine

摘  要:为解决留矿法采后形成的采空区处理和间柱回收问题,保障后续生产的安全和间柱资源的回收,本文结合盘龙铅锌矿采空区和矿柱的赋存条件,确定了现有空区的处理方式必须采用充填法处理,仅在独立的小采空区采用封闭空区的处理方法。同时对比分析了三种不同的间柱回采方法,通过优缺点比较最终选择上向水平分层充填采矿法作为间柱回采的主要方法。In order to solve the problem of the treatment of the mined out area and the recycling problem of the pillar,to ensure the safety of the follow up production and the recycle condition of the pillar, this paper based on the occurrence conditions of the PanLong lead-zinc mine goals and pillar, filling method for treatment of mined out area was been selected, the treatment method of closed space is used only in the small goals. At the same time, the analysis of three kinds of different pillar extraction methods shows the final selection of the horizontal slicing and filling mining method is the ultimate choice.

关 键 词:采空区 充填 间柱 采矿方法 

分 类 号:TD823.9[矿业工程—煤矿开采]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象