检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:Hadi Barghamadi P. Nater P. Huwyler
机构地区:[1]Mahab Ghodss Consulting Engineering Co., Tehran, Iran [2]Poyry Switzerland LM., 161 8037 Zurich, Switzerland
出 处:《Journal of Hydraulic Engineering》2016年第1期60-66,共7页水利工程(英文版)
摘 要:The Urea Oya Multipurpose Development Project (UMDP) is a water transfer, hydropower and irrigation in the south-eastern part of the central highland region of Sri Lanka. During geotechnical site investigation program 42 hydraulic fracture tests and 42 impression packer tests were carried out in 3 boreholes to about 840 m depth. Based on the stress measurements the minimum and maximum horizontal stress ratios were calculated. In situ stress computations at all the tests were based on the assumption that the principal stress components were vertical (σv) and horizontal (σH and σh, the maximum and minimum, respectively). The results of the measurements had a direct impact on the design of the major openings bearing a high overburden--the underground powerhouse and the transformer cavern--and revealed a significant optimization potential concerning the selection of the lining system of the pressure shaft.
关 键 词:Hydraulic fracturing stress measurement in situ stress vertical stress horizontal stress pressure shaft.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.13