检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王衍行[1]
机构地区:[1]广东省水利电力勘测设计研究院,广东广州510635
出 处:《广东水利水电》2015年第11期46-49,65,共5页Guangdong Water Resources and Hydropower
摘 要:通过某灌区项目跨河涵管设计方案由现浇混凝土管变为沉管的讨论、变更过程,详细阐述了跨河反虹涵管采用沉管法的优劣;同时,通过详细阐述沉管主要施工过程,介绍了沉管施工的一般施工工艺和主要质量控制方法,对类似项目的实施有一定参考价值。Cross river inverted siphon culvert pipe is an important part in the construction of irrigation improvement,small watershed management and other livelihood projects. Immersed tube method is widely applied to river crossing culvert construction because of short construction period,less construction risk and investment. Through an irrigation project of cross- river culvert design scheme,the replacement of cast- in- place concrete tube with immersed tube has been discussed. The pros and cons of the immersed tube method have been explained in details. At the same time,through the elaboration of the immersed tube construction process,the general process and main quality control method of the sinking construction have been introduced,which can used as a certain reference value for similar project implementation.
分 类 号:TV652.2[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7