工程量清单计价模式下清单风险费用的确定  被引量:1

Determination of Risk Cost under BOQ Valuation Mode

在线阅读下载全文

作  者:师宪川 

机构地区:[1]重庆市地质矿产勘查开发局107地质队,重庆401120

出  处:《工程造价管理》2016年第2期40-42,共3页Engineering Cost Management

摘  要:风险费用是工程量清单综合单价费用构成中的重要组成部分,但实际工作中并未得到招标投标各方的重视。本文从风险管理角度介绍了清单计价中常见的风险类型以及确定工程量清单风险费用应考虑的因素,提出按照不平衡的方式确定风险费用和在编制清单项目特征中增加风险范围描述的设想,并通过案例分析了期望值法确定风险费用的方法。Risk cost is an important part of the comprehensive unit price in bill of quantities, but it doesn't get the attention of tenders and bidders in the actual work. in this article, it introduced the risk types that are common in the bill pricing and the factors that shall be considered to determine the risk cost in the bill of quantities from the perspective of risk management, and put forward the ideas of de- termining the risk cost according to the unbalanced ways and increasing the descriptions about the risk range when the in characteris- tics of list items are to be compiled, and analyzed the method of determining the risk cost with expectancy method through the case analysis.

关 键 词:工程量清单 风险费用 计算 

分 类 号:TU723.3[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象