Some experiences with BEPCII SRF system operation  

Some experiences with BEPCII SRF system operation

在线阅读下载全文

作  者:黄彤明 林海英 孙毅 戴建枰 王光伟 潘卫民 李中泉 马强 王群要 赵光远 米正辉 沙鹏 

机构地区:[1]Institute of High Energy Physics,Chinese Academy of Sciences [2]Key Laboratory of Particle Acceleration Physics and Technology,IHEP,Chinese Academy of Sciences

出  处:《Chinese Physics C》2016年第6期74-79,共6页中国物理C(英文版)

摘  要:The Superconducting Radio Frequency (SRF) system of the upgrade project of the Beijing Electron Positron Collider (BEPCII) has been in operation for almost 8 years. During operation, many problems have been encountered, such as excessive heating of the power couplers, frequent beam trips during high intensity colliding, false arc interlock trigger and so on. Among them, some has been solved successfully, some have been alleviated. This paper will describe some experiences with BEPCII SRF system operation, including the symptoms, causes and solutions of problems.The Superconducting Radio Frequency (SRF) system of the upgrade project of the Beijing Electron Positron Collider (BEPCII) has been in operation for almost 8 years. During operation, many problems have been encountered, such as excessive heating of the power couplers, frequent beam trips during high intensity colliding, false arc interlock trigger and so on. Among them, some has been solved successfully, some have been alleviated. This paper will describe some experiences with BEPCII SRF system operation, including the symptoms, causes and solutions of problems.

关 键 词:superconducting radio frequency superconducting cavity power coupler ACCELERATOR 

分 类 号:O572.214[理学—粒子物理与原子核物理]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象