检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]江苏大学土木工程与力学学院,江苏镇江212013 [2]中建三局第三建设工程有限责任公司,武汉430073 [3]上海建科工程咨询有限公司,上海200032
出 处:《建筑技术》2016年第6期537-540,共4页Architecture Technology
摘 要:某工程总建筑面积39.5万m^2,由地下室、商业裙房、东塔楼和西塔楼组成。塔楼核心筒竖向剪力墙结构施工中采用低位顶升模架体系,为保证该模架体系安全运行,预防事故发生,采取了建立顶模运行管理体系、完善顶模体系使用维护、加强顶模运行过程控制等施工管理措施,确保了核心筒的施工质量和进度。A project consists of basement, commercial podium building, east and west tower buildings, covering a gross building area of 395000m2. Low-altitude jacking formwork system was used in longitudinal shear wall structure of tower building core tube. A series of construction management measures were adopted to guarantee safe operation of the formwork system and prevention of accident, such as establishment of jacking formwork management system, emphasis on application and maintenance of jacking formwork system and strengthening of jacking formwork travel course control. These measures successfully ensured the construction quality and schedule of the core tube.
分 类 号:TU755.2[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145