检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]贵阳供电局,贵州贵阳5500002 [2]济南供电局,山东济南250012
出 处:《贵州电力技术》2016年第5期27-30,共4页Guizhou Electric Power Technology
摘 要:为了解决城市变电站建设过程中的土地问题,提出了一种35 kV绿色紧凑型变电站的设计方案。相对于35kV变电站的典型设计方案,该方案不需占用过多的土地资源,在本着不需要增加过多的投资的基础上,该方案不仅能保证配电网供电可靠性,还能兼顾南方电网公司提出的"绿色变电站"的概念,实现电力工业发展与环境保护的双赢效益。In order to solve the land problem in urban substations construction, one kind of 35 kV compact substations plan was designed. Compared with the typical design of the 35 kV substations, the design did not take up too much land resources. The plan can not only enhance the supply reliability of distribution network, but also took into account the concept of " green substations" which proposed by Southern Power Grid Company, and finally achieved win-win benefits for the development of power industry and environmental protection.
关 键 词:城市化 土地 稀缺资源 紧凑型变电站 绿色变电站
分 类 号:TM63[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222