检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国安全生产科学研究院,北京100012 [2]北京科技大学土木与环境工程学院,北京100083 [3]中国长江三峡集团公司,北京100038
出 处:《中国水能及电气化》2016年第5期45-49,共5页China Water Power & Electrification
摘 要:本文针对巨型水电工程建设的特点,在国内外现有经验的基础上按照MECE原则建立了应急能力评估体系,评估体系由两级指标构成,其中一级指标13个、二级指标45个。在白鹤滩水电工程的应用结果表明:评估体系能够发现应急管理中的薄弱环节,确定应急能力建设的方向和重点,可为水电工程建设的应急工作提供决策支持。In the paper, emergency capability assessment system is established in accordance with the principle of MECE principle on the basis of existing experience at home and abroad aiming at the characteristics of giant hydropower project construction. The assessment system consists of indicators at two levels, including 13 first grade indicators and 45 second grade indicators. The application results in Baihetan Hydropower Project are obvious that the assessment system can discover weak links in emergency management. The directions and keys of emergency capacity construction are determined, thereby providing decision support for the emergency work of hydropower project construction.
分 类 号:TV51[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.31