万州长江大桥船舶撞击力有限元分析  被引量:5

Finite Element Analysis of Ship Collision Force of Wanzhou Yangtze River Bridge

在线阅读下载全文

作  者:文传勇 

机构地区:[1]重庆市万州长江公路大桥管理处,重庆404025

出  处:《重庆交通大学学报(自然科学版)》2016年第2期17-20,44,共5页Journal of Chongqing Jiaotong University(Natural Science)

摘  要:随着三峡库区水位的提高,万州长江大桥拱圈存在船舶撞击的风险。结合万州长江河段航运情况,选择5种船型建立空间有限元仿真模型,对万州长江大桥桥墩、拱圈的船舶撞击作用进行了研究。结果表明:5 000 t船舶对大桥拱圈、桥墩的撞击力最大、作用时间最长,桥墩相对于拱圈受船舶撞击力的危害更严重;大桥拱圈、桥墩的极限侧抗力分别为2 000,350 t,库区175 m水位蓄水后,大桥拱圈、桥墩可承受极限撞击船舶吨位分别为1 094,115 t。With the rising of water level at Three Gorges Reservoir Region,the arch ring of Wanzhou Yangtze River Bridge is in danger of ship impact. Based on the shipping condition of Wanzhou reach of Yangtze River,an analytical study on the ship impact on the piers and arch ring of the bridge was conducted by means of setting up spatial finite element model on five different types of ships. The result shows that 5 000 t ships exert the greater impact on the bridge piers and the arch ring for longer acting time with greater impact on the piers. The ultimate lateral resistance capacities of the piers and arch ring are respectively 2 000 t and 350 t. When the water level reaches 175 m in the reservoir area,the affordable ultimate ship impact on the arch ring and piers are respectively 1 094 t and 115 t.

关 键 词:桥梁工程 船舶撞击力 安全运营 船撞风险 有限元分析 

分 类 号:U446.1[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象