检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:文传勇
机构地区:[1]重庆市万州长江公路大桥管理处,重庆404025
出 处:《重庆交通大学学报(自然科学版)》2016年第2期17-20,44,共5页Journal of Chongqing Jiaotong University(Natural Science)
摘 要:随着三峡库区水位的提高,万州长江大桥拱圈存在船舶撞击的风险。结合万州长江河段航运情况,选择5种船型建立空间有限元仿真模型,对万州长江大桥桥墩、拱圈的船舶撞击作用进行了研究。结果表明:5 000 t船舶对大桥拱圈、桥墩的撞击力最大、作用时间最长,桥墩相对于拱圈受船舶撞击力的危害更严重;大桥拱圈、桥墩的极限侧抗力分别为2 000,350 t,库区175 m水位蓄水后,大桥拱圈、桥墩可承受极限撞击船舶吨位分别为1 094,115 t。With the rising of water level at Three Gorges Reservoir Region,the arch ring of Wanzhou Yangtze River Bridge is in danger of ship impact. Based on the shipping condition of Wanzhou reach of Yangtze River,an analytical study on the ship impact on the piers and arch ring of the bridge was conducted by means of setting up spatial finite element model on five different types of ships. The result shows that 5 000 t ships exert the greater impact on the bridge piers and the arch ring for longer acting time with greater impact on the piers. The ultimate lateral resistance capacities of the piers and arch ring are respectively 2 000 t and 350 t. When the water level reaches 175 m in the reservoir area,the affordable ultimate ship impact on the arch ring and piers are respectively 1 094 t and 115 t.
关 键 词:桥梁工程 船舶撞击力 安全运营 船撞风险 有限元分析
分 类 号:U446.1[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.200