检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:赵娜[1]
机构地区:[1]新疆水利水电勘测设计研究院,新疆乌鲁木齐830000
出 处:《云南水力发电》2016年第3期61-63,69,共4页Yunnan Water Power
摘 要:介绍北疆调水工程改扩建工程输水干渠渠道的设计,填筑,排水及处理措施。因干渠规模变大加高结构设计,相应对渠系建筑物进行加长改建。工程渠道贴坡加高水力学复核、方案设计、渠道填筑及坡稳定计算等。该工程已于2015年进入施工阶段,渠道加高工程建成后将会较大的缓解当前用水需求的矛盾,更好地促进北疆调水工程的协调和可持续发展。The paper deals with design, placement, drainage and treatment measures of the water conveyance trunk canal of the extension and rehabilitation works of the north Xinjiang water delivery project. Because the scale of trunk canal system is enlarged, the canal shall be heightened and its associated structures shall be rehabilitated, therefore the canal slope hydraulic parameters and stability calculation shall be rechecked, its plan and placement shall be designed accordingly. The construction of the project started in 2015. Heightening of the canal will significantly alleviate the current unbalance between supply and demand and further promote coordination and sustainable development of the water delivery project in north Xinjiang.
分 类 号:TV672[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3