检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]长安大学环境科学与工程学院,陕西西安710054 [2]西安航空学院能源与建筑学院,陕西西安710077
出 处:《供水技术》2016年第3期30-33,共4页Water Technology
摘 要:长距离输水工程在管道非正常运行的水力过渡过程中常常会产生水锤现象,危害极大,但对其防护的措施往往只有安装普通排气阀。本文结合宝鸡市某实际工程案例,对长距离重力流和水泵加压联合输水管线的水锤现象及防护效果进行模拟,并给出缓冲排气阀与双向调压塔相结合的安全水锤防护建议。Water hammer was often produced in long distance water supply transmission during the hydraulic transients in pipe system. It was very harmful for the pipeline, but the control measures were usually by exhaust valves only. Combining with the actual project cases in the Baoji City, a computer simulation was performed on water hammer and control effect combined long distance water transmission pipeline of gravity and pump pressure flow. The advices for water hammer control with buffer exhaust valve and two-way surge tank were given here.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.16.48.173