检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]河海大学地球科学与工程学院,江苏南京211100 [2]福建华东岩土工程有限公司,福建福州351000
出 处:《资源环境与工程》2016年第3期364-368,共5页Resources Environment & Engineering
摘 要:洪屏抽水蓄能电站由于引水隧洞和地下厂房施工,改变了天然地下水流场。为研究施工对于地下水的影响,需要对区内地下水水位动态进行观测和分析。上水库库周多数山体地下水位和相对隔水层均高于正常蓄水位,不存在渗漏问题。由上水库各区域钻孔水位动态曲线图分析可得,上水库的防渗及监测重点在西北垭口、西副坝与西南副坝之间山体及南库岸地段山体。As the reason of construction, original flow field of groundwater in Hongping Pump-storage Power Station has changed. For studying the influence of construction to analysis of groundwater level dynamic is needed. The groundwater and guiding the further construction, observation and most groundwater levels and relative impermeable layers in surroundings of upper reservoir are higher than normal pool level, there are no leakage problems. According to the curve groundwater level dynamic in each region of upper reservoir, the key areas of seepage control and monitoring are the mountain between northwest pass area, west auxiliary dam and southwest auxiliary dam, and the mountain in south reservoir bank.
分 类 号:P641.2[天文地球—地质矿产勘探]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.221