CCS水电站输水隧洞双护盾TBM穿越不良地质段的处理技术  被引量:11

Treatment Technology of Crossing Unfavorable Geological Tunnel Section by Double Shield TBM at CCS Hydropower Station Water Conveyance Tunnel

在线阅读下载全文

作  者:杨继华[1] 苗栋[1] 杨风威[1] 齐三红[1] 姚阳[1] 

机构地区:[1]黄河勘测规划设计有限公司,河南郑州450003

出  处:《资源环境与工程》2016年第3期539-542,共4页Resources Environment & Engineering

摘  要:CCS水电站输水隧洞在TBM施工过程中,遇到了砂岩崩解砂化、断层破碎带塌方、突涌水、围岩失稳等不良地质条件,导致了掘进速度缓慢、卡机等不良后果。经过采取有效的处理措施,TBM通过了不良地质段,为输水隧洞的如期完成提供了保障。The sandstone disintegrating, fault fracture zone collapse, water inrush, surrounding rock instability were encountered in TBM construction process, which leading to the low excavation speed, TBM blocked and other adverse consequences. The TBM crossed the unfavorable tunnel section by taking effective measures, which provided a guarantee for completion of water conveyance tunnel timely.

关 键 词:CCS水电站 输水隧洞 双护盾TBM 不良地质条件 处理技术 

分 类 号:TV732.3[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象