检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:田启忠[1]
机构地区:[1]中国石化胜利油田分公司石油工程技术研究院,山东东营257088
出 处:《石油钻探技术》2016年第3期67-71,共5页Petroleum Drilling Techniques
基 金:国家科技重大专项"大型油气田及煤层气开发"子课题"胜利油田薄互层低渗透油田开发示范工程"(编号:2011ZX05051)部分研究内容
摘 要:在筛管完井注水泥过程中,封隔器破损或卡封部位井径扩大,水泥浆会漏入筛管段将油层封固。为了打开油层重新建立油气生产通道,基于自主研制的水泥环挤压装置,形成了水泥环挤压酸洗管柱。水泥环挤压装置两端的封隔总成能够密封挤压装置与筛管之间的环空,然后利用节流传压总成传递的高压破碎筛管外的水泥环,而管柱底部的密封插管可打开人工井底的洗井阀并建立反循环洗井通道,将筛管外的水泥碎渣反洗至地面,恢复近井地带的渗透率。水泥环挤压酸洗管柱在胜利油田5口井进行了现场试验,成功率100%,试挤作业施工后,被封固的筛管段与地层连通性恢复正常。水泥环挤压酸洗管柱的成功研制,为解决筛管顶部注水泥完井后筛管段漏入水泥的问题提供了一种新的处理方法。In the process of cementing in screen pipe during or after well completion, cement slurry may leak into the screen pipe section and cause damage to the formation due to packer failure or wellbore enlargement at the packer setting position. In order to reopen the oil zone and rebuild access for oil and gas production, the cement sheath squeezing with an acid washing string were developed on the basis of the independently-developed cement sheath squeezing device. The packer assembly at both ends of the cement sheath squeezing device can seal the annulus between the extrusion device and the screen pipe. Then, the cement sheath outside the screen pipe is crushed due to high pressure from throttling and pressure-transmitting assembly. The seal tube at the bottom of the string can open the washing valve at the bottom of the artificial hole and thus build a back-cycling well washing access. In this way, the crushed cement sheath can be backwashed out to the ground and formation permeability near the wellbore can be recovered. The cement sheath squeezing and acid washing string have been tested in five wells in the Shengli Oilfield, with 100% success. After the execution of squeezing, the communication between the plugged screen pipe section and the formation was regained. The successful development of the string provided a new method to solve the problem of cement leaking into the formation in the screen pipe section after well completion of cementing at the top of the screen pipe.
分 类 号:TE925[石油与天然气工程—石油机械设备]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.249