机构地区:[1]晋中职业技术学院,山西晋城0306012 [2]长沙理工大学电气与信息工程学院,长沙410000
出 处:《电瓷避雷器》2016年第3期84-92,共9页Insulators and Surge Arresters
摘 要:对山西煤矿集团鑫顺矿业35 k V变电站现有的进线线路绝缘配合、主变变压器接地以及变电站内部设备防雷措施进行了风险评估,并提出线路加装保护间隙、对变电站进行进线段保护设计、杆塔安装冲击散流装置、主变接地系统外引环形接地网以及变电站内部采用特种防雷变压器等精细化、差异性防雷改造措施,同时在实验室对保护间隙进行50%U的冲击试验,得出保护间隙最佳距离,并采用电磁暂态软件ATP-EMTP对线路安装保护间隙、外引环形接地网进行仿真计算和验证,从而得出此种精细化、差异性防雷改造措施。Taking the 35 k V substation in Shanxi coal mining as example, the line insulation coordination of current entrance lines, grounding of the main transformer and the protection measures against lightning of the equipment in the substation are analyzed, and the risk evaluations are made.Some suggestions and measures are presented such as installing protection gap to the lines, protection design of the entrance line to the substation, installing impulse current dispersing device on the tower,adding ring-type grounding grid to the grounding system of the main transformer, and using special transformer in substation to prevent from lightning. Meanwhile, the 50% impulse voltage discharge tests of the protection gap are made in laboratory so as to get the optimization protection clearance. The electromagnetic transient software ATP-EMTP is used to make simulation and verification of the protection gap for line installation and external grounding ring in order to realize a fine and difference lightning transformation measures.
关 键 词:风险评估 冲击散流 特种防雷变 精细化 差异性 ATP-EMTP
分 类 号:TM63[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28