广州周大福金融中心施工电梯数量计算方法的探索与应用  被引量:1

Exploration and Application of Construction Elevators Calculation Method at Chow Tai Fook Finance Center in Guangzhou

在线阅读下载全文

作  者:叶浩文[1] 孙晖[2] 李杰[2] 

机构地区:[1]中国建筑股份有限公司,北京100037 [2]中国建筑第四工程局有限公司,广东广州510000

出  处:《施工技术》2016年第12期38-41,46,共5页Construction Technology

摘  要:提出采用"粗算精验"理论的施工电梯数量确定方法,即先按粗算法经验公式计算所需施工电梯的总数,做平面及立面的具体规划后,再按估算的人数及物资量,通过提出的精算法复核验证施工电梯运输能力与工程实际运输需求的匹配程度,从而达到优化配置施工电梯的目的,提高了施工组织策划的科学性。The method to determine the amount of construction elevators proposed in this paper adopts the theory of ‘rough estimate and precision inspection '. Firstly,the amount of construction elevators is calculated according to the method of rough estimate. After the specific planning at plan or profile is determined,matching degree between traffic capacity of construction elevators and the actual transportation demand is checked with the method of precision inspection according to the estimated workers and goods amount. This method achieves the objective of optimal allocation of construction elevators and improves the scientificalness of the construction organization plan.

关 键 词:高层建筑 施工电梯 计算方法 拟合公式 

分 类 号:TU857[建筑科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象