检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘其胜[1]
机构地区:[1]冀中能源股份有限公司邢东矿,河北邢台054001
出 处:《矿山测量》2016年第3期21-23,共3页Mine Surveying
摘 要:邢东矿建下压煤占全矿井地质储量的82.8%,目前矿井建下压煤开采方案主要为充填开采与条带开采,但条带开采资源采出率低,吨煤掘进率高,大面积应用将大幅度减少矿井服务年限。而充填开采其成本太高,约为普通回采成本的4倍。本文以1200采区为研究对象,创新提出了条带充填开采技术,为建下压煤开采开辟了新视野。Amount of pressed coal under buildings was accounting for 82.8% of the mine geological reserve. Currently, mining schemes of pressed coal under buildings were mainly the strip exploitation and the filling exploitation, but the re- sources recovery of the strip exploitation was low, excavation rate of the ton coal was high. Large area applications of the strip exploitation would significantly reduce the service life of the mine. Cost of the filling exploitation was high that it was about four times the normal recovery. In the paper, strip -filling exploitation was proposed taking 1200 mining area as the research object opening up the new horizons for the mining of pressed coal under buildings.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.145.116.193