检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:顾艳[1] 贾振[1] 刘进东[1] 杨阳[1] 相政乐[1] 赵利[1] 张振东[1]
机构地区:[1]中海油能源发展股份有限公司管道工程分公司,天津300452
出 处:《管道技术与设备》2016年第3期7-9,57,共4页Pipeline Technique and Equipment
摘 要:在深水GSPU湿式保温管道节点补口施工中,主体保温层预热效果对节点浇注材料(CPU)和GSPU之间的界面粘接强度起到关键性的作用。文中将先进的红外辐射加热技术引入到节点施工中,大量实验证明红外辐射加热的效果良好,能耗低、效率高,工艺简单可靠。同时,利用开发的节点红外辐射加热装置开展了GSPU湿式保温管模拟工艺试验,结果证明该套工艺和设备可满足节点施工的工艺技术要求。In the construction of the field joint for the deep water insulation pipe,thermal insulation preheating had important influence on the bonding strength between CPU and GSPU. Advanced infrared radiation preheating technology was introduced into the construction of field joint in this paper,through large experiments,it turns out that infrared radiation heating performed well with low energy consumption,high efficiency,reliable process and easy and reliable process. Meanwhile,field joint installation process testing of hollow glass microsphere syntactic polyurethane deep water wet insulation pipe was carried out with the developed infrared radiation heating device,and it proves that the process and equipment can satisfy the construction requirement.
关 键 词:玻璃微珠复合聚氨酯 浇注固态聚氨酯 红外辐射加热 节点补口
分 类 号:TE8[石油与天然气工程—油气储运工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222