机构地区:[1]长江勘测规划设计研究有限责任公司,湖北武汉430010
出 处:《水电与新能源》2016年第6期11-14,56,共5页Hydropower and New Energy
摘 要:以乌江银盘水电站为例,介绍了该电站发电厂房坝段须提前挡水的原因及所采取的工程措施;对厂房挡水时的整体稳定性和建基面的应力进行了复核;采用三维有限元法,对厂房结构挡水时的受力状态进行了分析;根据计算工况,提出了计算方案,对计算结果进行了分析。经数值计算验证,提前挡水的方案合理、可行。In the construction of Yinpan Hydropower Station , the powerhouse section of the dam is required to retain the water ahead of schedule .Reasons of this requirement and corresponding engineering measures are introduced .Then, the overall stability of the powerhouse and the stresses along the foundation plane are evaluated .Also, the stress state of the powerhouse structure under the water retaining condition is analyzed with the three dimensional finite element method . The results show that the ahead-of-schedule water retaining scheme is feasible .
分 类 号:TU271.1[建筑科学—建筑设计及理论] TV52[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.118.31.32