检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]白银有色集团股份有限公司西北铅锌冶炼厂,甘肃白银730900
出 处:《中国有色冶金》2016年第3期6-9,34,共5页China Nonferrous Metallurgy
摘 要:湿法炼锌浸出过程中预中和工序有铁矾渣提前形成现象,铅银渣、铁矾渣互混,致使两渣不能有效回收利用。本文根据生产实践中铅银渣、铁矾渣的渣量及指标变化,分析了温度、酸度等控制条件对两渣的影响,通过改造,将预中和作为沉矾头槽,降低阳离子浓度、提高酸度等,有效地抑制了预中和过程中铁矾渣提前形成,降低了两渣含锌。During pre-neutralization section of zinc hydrometallurgy,jarosite residue will be yielded ahead of time,which results in mixing of Pb-Ag residue and jarosite reside and consequentially unfavorable recovery of the two types of residue.The paper analyzes the influence of temperature and acidity on leached residue according to Pb-Ag residue and jarosite reside yield and indicator changes during production.Through technical modification,the preneutralization is changed to be the first tank of the jarosite process,which can reduce cation concentration and increase acidity.In this way,forming of jarosite residue ahead of time will be effectively inhibited and zinc content in two types of residue reduced.
分 类 号:TF813[冶金工程—有色金属冶金]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.30