检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张建辉[1] 张煜[1] 刘文斌[1] 程龙[1] 温斌[1] 王杨[1]
机构地区:[1]中水东北勘测设计研究有限责任公司,吉林长春130021
出 处:《水力发电》2016年第7期58-60,共3页Water Power
摘 要:龙江水电站枢纽工程引水系统进水口经过进水口位置、形式、引水洞线方案布置比较及其前沿高边坡的稳定分析,最终选用侧向漏斗式进水口形式,成功地解决了高边坡可能不稳定导致进水口堵塞等问题,避开了断层对引水隧洞高压岔管部位的影响,且洞线布置更为平直、顺畅,水头损失更小。By comparing intake position, intake type and diversion tunnel axis layout schemes and analyzing the stability of high slope in front of intake, the lateral funnel-type intake is finally chosen as the water diversion system intake of Longjiang Hydropower Station Complex Project. This intake design eliminates the risk of intake blocking caused by high slope instability, and makes the axis of tunnel more straight and smooth, the head loss more smaller. Meanwhile, the intake design can avoid the influence of fa.uhs on high-pressure bifurcated pipe of diversion tunnel.
关 键 词:侧向漏斗式进水口 水工模型试验 龙江水电站枢纽工程
分 类 号:TV671[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.46