检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王小璞
机构地区:[1]山钢集团日照有限公司炼钢项目部,山东日照276826
出 处:《山东冶金》2016年第3期45-46,49,共3页Shandong Metallurgy
摘 要:莱钢炼钢厂利用KR脱硫设备进行了铁水预脱硅工业试验,试验确定铁水目标[Si]为0.25%~0.35%。采用新型脱硅剂,脱硅氧效率达70%以上,脱除0.1%[Si]脱硅剂消耗量为9.85 kg/t。影响KR脱硅效率的主要是脱硅渣碱度、铁水温度和加料速度。分析认为,合适的脱硅渣碱度为0.5~0.8,脱硅起始铁水温度为〈1 350℃,脱硅剂加料速度为3.5~4.5 kg/s。The hot steel which contains lower silicon is the goal in the converter process. Because of the limitation of the raw material conditions and blast furnace operation conditions, it is unstable that [Si] in hot metal in converter steelmaking. The KR industrial desiliconization were test using hot metal desulphurization equipment in the steel-making plant of Laigang. The 0.25%-0.35% range of the target [Si] is determined in the experiment. Using new type of silicon removal agent, the efficiency of desiliconization and deoxygenation are more than 70%. And the consumption of desiliconized agent of removing 0.1% [Si] is 9.85 kg/t. The main sections in the process which influences the efficiency of KR removal is the basicity of the desiliconization slag, the temperature of hot metal and the speed of feeding. By analysis, the basicity of the slag is 0.5-0.8, the temperature of the starting metal is over 1 350 ℃, and the rate of feeding is 3.5-4.5 kg/s.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.44