KR工序铁水预脱硅工业试验研究  被引量:2

Experimental Study on Industrial Test of Hot Metal Desilicon in KR Process

在线阅读下载全文

作  者:王小璞 

机构地区:[1]山钢集团日照有限公司炼钢项目部,山东日照276826

出  处:《山东冶金》2016年第3期45-46,49,共3页Shandong Metallurgy

摘  要:莱钢炼钢厂利用KR脱硫设备进行了铁水预脱硅工业试验,试验确定铁水目标[Si]为0.25%~0.35%。采用新型脱硅剂,脱硅氧效率达70%以上,脱除0.1%[Si]脱硅剂消耗量为9.85 kg/t。影响KR脱硅效率的主要是脱硅渣碱度、铁水温度和加料速度。分析认为,合适的脱硅渣碱度为0.5~0.8,脱硅起始铁水温度为〈1 350℃,脱硅剂加料速度为3.5~4.5 kg/s。The hot steel which contains lower silicon is the goal in the converter process. Because of the limitation of the raw material conditions and blast furnace operation conditions, it is unstable that [Si] in hot metal in converter steelmaking. The KR industrial desiliconization were test using hot metal desulphurization equipment in the steel-making plant of Laigang. The 0.25%-0.35% range of the target [Si] is determined in the experiment. Using new type of silicon removal agent, the efficiency of desiliconization and deoxygenation are more than 70%. And the consumption of desiliconized agent of removing 0.1% [Si] is 9.85 kg/t. The main sections in the process which influences the efficiency of KR removal is the basicity of the desiliconization slag, the temperature of hot metal and the speed of feeding. By analysis, the basicity of the slag is 0.5-0.8, the temperature of the starting metal is over 1 350 ℃, and the rate of feeding is 3.5-4.5 kg/s.

关 键 词:铁水 预脱硅 脱硅氧效率 碱度 下料速度 

分 类 号:TF703[冶金工程—钢铁冶金]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象