检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]同济大学地下建筑与工程系,上海200092 [2]同济大学岩土及地下工程教育部重点实验室,上海200092 [3]上海南汇建工建设(集团)有限公司,上海201399
出 处:《中国公路学报》2016年第6期162-168,共7页China Journal of Highway and Transport
基 金:国家自然科学基金项目(41272288);浦东新区科技发展基金创新资金项目(PKJ2013-C08)
摘 要:为了给群桩基础优化设计以及既有桩基利用条件下的新桩桩长设计提供参考,基于剪切位移法理论,建立单桩桩顶荷载-位移模型;提出等沉降原理,考虑群桩效应建立群桩沉降计算模型,并解析群桩临界桩长关系。根据模型函数优化法验证其桩长关系的合理性,并分析不同土的泊松比、桩间距和桩的弹性模量对群桩长度的影响。结果表明:随长桩长度增加,短桩长度达到峰值后减小;土的泊松比、桩间距和桩的弹性模量等参数取值增大时,短桩长度峰值增大,但增幅不同;在总桩长一定时,与等桩长时相比,变桩长群桩基桩的柔度值相对误差显著减少。To provide a reference for the basic optimization design of pile groups and the existing pile foundation reuse with the design of pile length for new pile,based on shear displacement method,a model of load and displacement on single pile head was established.A similar settlement principle of pile-group was proposed for the analysis of the relationship of the criticalpile length of pile group,and the calculation model for settlement of pile group by considering pile group effect was established.The validity of its pile-length relationship was verified by pattern function optimization method and the influences of different soil Poisson's ratios,pile spacing and pile elastic modulus on critical length of a pile group were analyzed.The results show that with the increase of long pile length,the length of short pile increases to a peak value and then decreases;as parameter values of soil Poisson's ratio,pile spacing and pile elastic moduli increase,the peak value of short pile length increases with different growth amounts.The cases show a significant decrease in relative error of slenderness between foundation piles in an unequallength pile group compared to an equal-length pile group with the same total pile length.
关 键 词:道路工程 桩长优化 等沉降原理 剪切位移法 沉降计算
分 类 号:U416.1[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7