检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]国家能源局大坝安全监察中心,浙江杭州311122 [2]浙江华东工程安全技术有限公司,浙江杭州311122
出 处:《人民长江》2016年第12期99-103,共5页Yangtze River
摘 要:引张线广泛应用于大坝水平位移监测,但在长期运行过程中会因线体卡阻而影响观测成果的真实性。因引张线的护管为不透明的PVC管或镀锌管,直接观察引张线卡阻部位存在一定难度,更换整根护管也显得不经济。为经济有效地消除卡阻,介绍运用三角形试验来准确判定卡阻位置的方法,并给出了相关计算公式。工程实例验证表明,该方法可准确找到卡阻位置,为以后引张线卡阻问题处理提供了参考。The extension line is widely used in dam horizontal displacement monitoring,but obstruction would occur in long-term operation and may affect the authenticity of observation results. Generally,as the protective pipe of extension line is opaque PVC pipe or galvanized pipe,it is difficult to directly observe the obstruction location,and the complete replacement of protective tube is not economical. In order to economically and effectively eliminate the obstruction,the method of using triangle test is introduced and the relevant calculation formula is given. The engineering practice shows that this method can accurately find the obstruction location,which provides reference for extension line obstruction in other project.
分 类 号:TV698[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145