检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘道君[1]
出 处:《城市道桥与防洪》2016年第7期32-34,8,共3页Urban Roads Bridges & Flood Control
基 金:2014年度合肥市大建设项目(2014SZ37)
摘 要:合肥市集贤路、汤口路节点工程不仅是集贤路工程的重要组成部分,而且该工程方案与汤口路、合九铁路节点工程方案相互依存、彼此影响。对这两个节点进行混合型方案分析,得到节点研究的前置条件,结合周边建设条件分析及区域路网交通功能需求,提出两种工程设计方案,经技术和经济比选后,确定建设的最优方案。The node project of Jixian Road and Tangkou Road in Heifei City is not only an important part of Jixian Road Project, but also depends on and influences on the node project of Tangkou Road and Hefei-Jiujiang Railway with each other. The article analyzes the combination scheme of these two nodes to achieve the precondition of node study. According to the analysis of surrounding construction condition and the traffic function demand of areal road network, the article proposes two engineering design schemes. The optimal scheme of construction is defined after the comparison and selection of technologies and economy.
分 类 号:U412.35[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222