浅谈浮法玻璃企业的企业管理之五——浮法玻璃生产线的项目后评价  

Discussion on Business Management of Float Glass Enterprise——Post project evaluation of float glass production line

在线阅读下载全文

作  者:左志献 李万春[2] 魏会元 

机构地区:[1]秦皇岛奥格集团有限公司,秦皇岛市066000 [2]秦皇岛玻璃工业研究设计院,秦皇岛市066000 [3]天津开泰建筑材料销售有限公司,天津市300000

出  处:《玻璃》2016年第6期45-48,共4页Glass

摘  要:项目后评价是在项目完成后对项目的全过程进行后评价,通常包括项目前期阶段、工程建设阶段、生产运营阶段和项目社会环境的影响等评价内容。叙述了玻璃企业项目后评价的意义、主要内容、基本方法和主要技术指标,提出了一些针对性的建议,对浮法玻璃企业的冷修技术改造和项目建设有一定的参考价值和指导意义。Post project evaluation means that an evaluation of overall process of the project was conducted after the project completion. The evaluation covers earlier stage of the project, engineering construction stage, production operation stage and social environment influence. The significance, main points, basic methods and main technical parameters of post project evaluation of glass factory were stressed. Some specific suggestions were presented. This article can be used as guidance and reference for glass company in cold repair technical transformation and project construction.

关 键 词:建设项目 浮法生产线 项目后评价 

分 类 号:TQ171[化学工程—玻璃工业]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象