检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]国网河北省电力公司沧县供电分公司,河北省沧州市061000 [2]国网河北省电力公司沧州供电分公司,河北省沧州市061000
出 处:《河北工程技术高等专科学校学报》2016年第2期29-31,共3页Journal of Hebei Engineering and Technical College Quarterly
摘 要:某地110 kV站1号主变停电检修前调控中心对该主变进行调档时发现总是出现"滑档"现象,停电后高压试验人员对该主变进行高压侧绕组(110 kV侧)直流电阻测试时发现,有载分接开关在奇数分接位置时的绕组相互问差别数据较上次试验均有明显的增长,最大差别达到1.77%。现场吊检发现切换开关室内壁上C相奇数的静触头及切换开关上对应的静触头在垂直方向和水平方向稍有倾斜,且触头上有明显的烧蚀痕迹。现场及时进行了处理,消除了隐患。When adjusting the shift of No.1 main transformer at 110 kV substation,the control center always found the "sliding shift" phenomenon before the substation was shut down for inspection.After power cut,the test personnel measured HV winding's DC resistance,and found when the load tap-changer was at odd number tap position,the difference of winding data was larger than that of the last time,the largest reached to 1.77%.They found the static contact of c-phased odd number at change-over switch inner wall and the static contact of change-over switch were inclined in vertical direction and horizontal direction,and the contacts were obviously ablated.On the site,the treatment was taken to remove the hidden dangers.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229