检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中石化重庆涪陵页岩气勘探开发有限公司,重庆涪陵408014 [2]长江大学非常规油气湖北省协同创新中心,湖北武汉430100
出 处:《探矿工程(岩土钻掘工程)》2016年第7期37-41,共5页Exploration Engineering:Rock & Soil Drilling and Tunneling
摘 要:页岩气生产井投产前,都要进行大规模分段压裂,生产套管必须能承受不低于90 MPa的施工压力。2013年涪陵工区试验井组相继出现2口井稳不住压现象,导致长水平段分段压裂的储层改造工艺受限,该问题一时成为制约涪陵页岩气田钻井生产和质量的一大"瓶颈"。为此,从生产套管设计、施工、治理3个方面进行了防漏堵漏技术措施研究,并取得一些进展,较好地满足了页岩气高效开发的需要。本文介绍了涪陵页岩气一期产建套管防漏堵漏对策与实践成果,为国内类似页岩气区块的开发提供借鉴和参考。Before the operation of shale gas production well, large-scale should be carried out, the production casing must be able to bear the construction pressure of ≥90MPa. In 2013, unsteady pressure happened in 2 wells of testing well group in Fuling working area, which resulted in the subsection fracturing technology being confined in long horizontal for reservoir reconstruction, this problem sometimes became the bottleneck that resticted Fuling shale gas drilling production and quality. Therefore, the technical measures of leakage proof and plugging were studied in production casing design, construction and treatment with some progress to meet the requirement of efficient shale gas development. This paper introduces the countermeasures and practice achievements in leakage proof and plugging of casing in the first phase of Fuling shale gas, which provides the reference for the development of simiar shale gas block in China.
关 键 词:水平井 高压气井 生产套管 气密封 特殊螺纹 堵漏 涪陵页岩气田
分 类 号:P634.8[天文地球—地质矿产勘探] TE28[天文地球—地质学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.220.224.115