检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘新杰
出 处:《交通信息与安全》2016年第3期126-133,共8页Journal of Transport Information and Safety
摘 要:在大范围机动车OD调查难以开展的背景下,通常采用路段流量进行OD反推,针对传统路段流量反推法无法检验分布结构的缺点,提出一种利用局部路段真实OD矩阵进行区域OD矩阵更新的方法。即从区域先验OD矩阵中减去模型Select Link计算的特定路段OD矩阵,再加上该路段真实OD矩阵,通过替换将区域分布结构更新。当区域多个路段真实OD矩阵需要替换到区域OD矩阵中时,采用两步循环替换法:第一步,单个路段循环替换,每个路段替换后的OD矩阵作为下一路段Select Link计算的输入;第二步,利用第一步的最终结果,对所有路段OD矩阵进行整体替换。以桂林绕城(东)高速为例进行验证,与传统OD反推方法相比,结果 OD矩阵长途出行比例提高了7%,反映了区域机动车分布变化规律,路段流量分配值与调查值相关系数达0.99,证明了更新后OD矩阵的准确性。It is difficult to carry out a wide range of origin-destination (OD) surveys for vehicles. The regional ODmatrix is commonly estimated by traffic flow in road sections. Considering the fact that the distribution structure cannotbe verified through traditional OD estimation methods, a new method is proposed. This method updates the regional ODmatrices with a Select Link analysis and replaces them with “real” OD matrices. Firstly, a specific sectional OD matrixcomputed by Select Link is subtracted from the regional priori OD matrix; then a "real" matrix of this road section is usedto update the distribution of regional traffic flow. A two-step iterative replacement procedure is applied when there aremultiple road sections in the regional priori OD matrix whose OD matrices need to be replaced by the "real" ones. Thefirst step is to replace each sectional OD matrix one by one. One replaced matrix will be used as input for the next link.The second step is to replace the whole regional priori OD matrix based on the first step. A case study of Guilin Ring(East) highway has been conducted to verify this method. Compared with the traditional OD estimation methods, thisnew method resulted in an increase of 7 % of the long-distance travels , which can reflect the variation of regional distribution of vehicles . The correlation coefficient between the assigned and the surveyed traffic flow of road sections reaches0.99 , which verifies the accuracy of the updated regional OD matrix.
关 键 词:交通规划 OD矩阵更新 SELECT Link模型 循环替换法 先验OD矩阵
分 类 号:U491.113[交通运输工程—交通运输规划与管理]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145