基于交货期的滚动生产计划编制方法的改进——以某电缆厂为例  

IMPROVEMENT ON THE ROLLING PRODUCTION PLANNING METHOD CONSIDERING THE DELIVERY DATA——WITH A CABLE FACTORY AS EXAMPLE

在线阅读下载全文

作  者:欧阳珍[1] 包先建[1] 

机构地区:[1]安徽工程大学,安徽芜湖241000

出  处:《巢湖学院学报》2016年第3期97-102,共6页Journal of Chaohu University

摘  要:为增强滚动计划法在多品种小批量企业提高准时交货率方面的有效性,文章在对滚动计划法已有研究的基础上,提出一种分阶段优化的总体构想。有别于集成优化思想,分阶段优化是将滚动计划法在实施过程中面临的诸多问题划分层次,采用粗细结合的方法分别处理,通过回归分析对外协加工时间进行预测,针对性强、效率较高。最后通过仿真实验验证方法的有效性。In order to enhance the efficiency of the rolling method in improving the on-time delivery rate in multi-variety and small-batch enterprises, this paper proposes an overall idea of phased optimization based on the research of the rolling production planning method. Different from the integrated optimization, the phase optimization divides the problems into layers, then deals with them separately with thickness combination method. It uses regression analysis to predict the time of outsourcing processing; therefore it has the advantages of strong pertinence and high efficiency. Finally, the validity of the method is verified by simulation experiment.

关 键 词:滚动计划法 交货期紧迫度 产能规划 成组技术 

分 类 号:F224[经济管理—国民经济]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象