检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《工程管理学报》2016年第3期14-19,共6页Journal of Engineering Management
基 金:国家自然科学基金项目(71572124)
摘 要:为检验工程中合同条款签订的完整性与承包商的合同管理水平对于承包商索赔成功的影响,通过研究北方某仲裁委员会10年间的106个以裁决作为解决方式的工程案例,结果显示合同条款签订的完整性与承包商的合同管理水平对于承包商获得的仲裁裁决支持比例均具有正向影响,同时二者呈现出干扰型交互作用。进一步得出合同条款的签订亟需得到业主和承包商的重视,同时,承包商也要提升在合同实施阶段的管理水平,从而可以通过索赔得到应得的权益。To test the influence of the completeness of the contract terms and the level of the contractor's administration to the successful claim of contractor,through studying the 106 adjudication construction cases occurred in the arbitration commission in the northern city of China,the results show that both the completeness of the contract terms and the level of the contractors' administration have positive influence to the successful claim of contractor,and the interaction effect is interference. The results show that the Employer and the Contractor need pay more attention to the signing of the contract terms. The Contractor had better to promote the level of the Contractor's administration during the project construction stage so that they can be entitled to the right to claim.
分 类 号:TU723.3[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.33