洪屏抽水蓄能电站上库西副坝结构设计优化  

Design and Optimization of West Sub Dam of Upper Reservoir in Hongping Pumped-Storage Power Station

在线阅读下载全文

作  者:朱安龙[1] 王红涛[1] 张胤 张萍[1] 

机构地区:[1]中国电建集团华东勘测设计研究院有限公司,浙江杭州311122 [2]南京市水利规划设计院股份有限公司,江苏南京210006

出  处:《水力发电》2016年第8期34-37,共4页Water Power

摘  要:洪屏抽水蓄能电站上水库西副坝坝址地质条件差,地形凌乱。招标和技施阶段,根据对坝址区地形地质条件的进一步分析,对左右岸大坝体形、材料分区、趾板基础开挖与结构等开展设计优化工作。通过设计优化,采取了降低左岸趾板上游边坡高度,并加强边坡处理;取消右岸高趾墙;加强趾板帷幕灌浆等处理措施,在相同的投资条件下,简化了施工工艺,提高了大坝运行的安全性。The dam site of west sub dam of upper reservoir in Hongping Pumped-storage Power Station has a poor geological condition and messy terrain. During tendering and construction drawing design periods, the designs of left and right bank dam body shape, material partition, and foundation excavation and structure of toe slab are optimized according to further analysis on geological conditions of dam area. By design optimization, the height of left bank slope is reduced and the slope treatment is strengthened, the right high toe wall is canceled, and the curtain grouting of toe slab area is strengthened. Through above optimizations, the construction process is simplified and the safety of dam operation is improved under same investment condition.

关 键 词:混凝土面板堆石坝 高趾墙 高边坡 设计优化 洪屏抽水蓄能电站 

分 类 号:TV641.43[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象