Comparative Study on Telecommunications Base Stations' Power Supply Systems on Remote Sites in the Northern Part of Cameroon  被引量:1

Comparative Study on Telecommunications Base Stations' Power Supply Systems on Remote Sites in the Northern Part of Cameroon

在线阅读下载全文

作  者:Bello-Pierre Ngoussandou Oumarou Hamandjoda Haman Djalo 

机构地区:[1]Higher Institute of the Sahel, University of Maroua, P. O.Box 46 Maroua, Cameroon [2]National Advanced School of Engineering, University of Yaounde, P.O.Box 8390 Yaounde, Cameroon

出  处:《Journal of Energy and Power Engineering》2016年第7期431-441,共11页能源与动力工程(美国大卫英文)

摘  要:The TBS (telecommunications base stations) on remote sites in the northern part of Cameroon are mainly supplied by a system of two generating units. Only a few TBS located in the Waza and Benue National Parks are powered by a PV (photovoltaic) solar system to avoid any disturbance to wildlife. It is against this background that we decided to do a comparative study on these two systems. This study focuses on the reliability of electrical quantities, the environmental impact and the installation and operating costs of these two major systems namely the GU (generating unit) system comprising two generating units and the PV system. In conducting this study, we took a sample of TBS including those located in the Badjouma and Waza localities. After collecting data from mobile telephony operators, measurements of electrical quantities on the sites for twelve consecutive months and updating costs, their operation reveal indicators that are surprising, to say the least. Concerning the reliability index, the PV system is estimated at 99.9% as against 97.8% for the GU system. As for environmental impact, the mass of CO2 released by the GU system reached 1,707.5 tons in 25 years for a single TBS while the PV system produced no emissions. In addition to its contribution to climate change, the GU system pollutes its immediate environment through the spillage of waste and production of deafening noise. On the other hand, economic analysis shows mixed results. The GU system has a lower installation cost of $6,640 as against $174,550 for the PV system, whose investment cost is its main handicap. Regarding operating costs, the GU system peaks at $923,940 in 25 years while the PV system requires only $487,550 for the same duration.

关 键 词:Reliability of power supplies climate change energy costs. 

分 类 号:TN929.5[电子电信—通信与信息系统] TD611[电子电信—信息与通信工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象