检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中交四航局港湾工程设计院有限公司,广东广州510290
出 处:《水运工程》2016年第7期46-50,53,共6页Port & Waterway Engineering
摘 要:结合实际工程介绍了前板桩后低桩承台结构的应用特点,分析了在实际设计中的技术要点和注意事项。前板桩后低桩承台结构复杂,原有规范不完全适用。结合实际工程,考虑钢板桩变位不能完全复位、低桩承台卸荷等因素,进行三维数值模拟,得到了码头结构主要构件的内力,从桩基与承台连接方式等方面分析这些因素对结构的影响,从而为结构设计和优化提供了依据。Combining with practical engineering, the paper introduced the application characteristics of the front sheet-pile and offside-low pile platform, and analyzed the technical points and considerations in the actual design. The front sheet-pile and offside-low pile platform structure is complex, and the original specifications are not completely applicable.Combining with practical engineering, and considering the factors such as the unloading of low pile dim platform and that the deflection of steel sheet pile cannot be completely restored, it conducted the three- ensional numerical simulation to get the internal force of the main components in the wharf structure, and analyzed the influence of these factors on the structure from the aspects such as the connection mode between pile foundation and bearing platform, which provides the basis for structural design and optimization
关 键 词:前板桩后低桩承台 码头改造 板桩倾斜 三维数值模拟 卸荷 桩基连接方式
分 类 号:U656.112[交通运输工程—港口、海岸及近海工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145