作 者:任锦龙 王柏成[1] 金大鹏[1] 毛路[1] 窦越 王玉凤[1]
出 处:《建筑技术》2016年第8期730-732,共3页Architecture Technology
摘 要:中国人寿数据中心工程是安全性、稳定性、可靠性达到tier4级别的超大型服务器机房数据中心。数据机房采用模块化机房布局,将500余台服务器机柜和各种复杂精密设备排布在模块机房内,模块机房外机电专业管线集中于模块间的公共走道,现场可利用空间小且专业众多。通过BIM技术建模、参数化的管综排布、机电预制施工、可视化功能下的运输通道以及机柜排布方案的确定、施工模拟和仿真漫游等综合应用,确保了复杂施工顺利进行。China Life Insurance data center project is a super-large server computer room data center with tier4 security, stability and reliability. It adopts modular layout and contains more than 500 server cabinets and various complex precise equipment. Electromechanical pipelines are concentrated at the public corridor outside the modular computer room, so there is limited vacant space and complex disciplines. To ensure smooth construction, BIM technique was adopted for modeling, parameterized general pipeline arrangement, electromechanical prefabrication, determination of transportation corridor and cabinet arrangement scheme under visualization function, simulative construction and roaming.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.147