检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:郑晓民
机构地区:[1]广州地铁集团有限公司
出 处:《城市轨道交通研究》2016年第8期78-82,共5页Urban Mass Transit
摘 要:基于终点站道岔故障先通后复的处理原则,分析了各个操作环节的时间标准,计算了终点站每副道岔发生故障后的折返能力。通过道岔典型故障案例分析,指出关键作业环节效率低和行车调整措施不足是造成列车晚点的主要原因。提出了使用多种行车组织调整方法、合理组织大小交路、制定各个环节操作的标准时间以及减少人为原因晚点的行车组织优化方案。According to the treatment principle of metro terminal switche fault, the time standards of each operation link are analyzed, the train turn-back capacity on each turnout after the fault is calculated. By analyzing the typi- cal cause of delay in case of switch fault, it is pointed out that the key problems lie in the low efficiency during the course of turnback and the lack of feasible adjustments. In view of these problems, some optimized methods are pro- posed to adjust the size and proportion of the long/short route, make standard timetable for each link operation, and decrease the delays for artificial reasons.
分 类 号:U292[交通运输工程—交通运输规划与管理]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3