检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王发达 刘建刚[2] 艾德春[2] 刘洪洋[2] 李志刚[2]
机构地区:[1]山东华恒矿业有限公司云南永安煤矿,云南昭通657000 [2]六盘水师范学院矿业工程系,贵州六盘水553004
出 处:《煤炭技术》2016年第8期61-62,共2页Coal Technology
基 金:采矿工程省级特色重点学科(黔学位合字ZDXK[2015]9号);贵州省科技厅技术基金项目(黔科合LH字[2015]7619号);贵州省煤炭绿色开采及矿区生态环境保护科技创新人才团队文件(黔科通[2013]93号)
摘 要:为实现永安煤矿矿井高产高效,利用其现有技术装备条件,对原有矿井工作面巷道布置进行优化设计,将采区工作面开采顺序由后退式改为往复式,双巷掘进优化为沿空留巷设计。实现了综采面连续推采,提高了设备利用率;上区段撤除切眼与下区段安装切眼布置一条线,就近搬家,回撤、安装工艺大大简化,增加了工作面生产天数。In order to achieve high production and high efficiency of Yong' an coal mine, using its existing technology and equipment conditions to optimize the roadway layout of the original mine coal face, proposed mining sequence of coal face in mining area changed from retreating to reciprocating, double tunneling replaced with gob-side entry retaining. Actualized fully mechanized coal face continuous advancing mining and high facility availability; roadway of withdrawn open-off cut in upper section and installed open-off cut lower section arranged in a line, shorten transit distance, simpler equipment withdrawal and installation process, increased the number of production days.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28