检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:舒丽红[1]
出 处:《西安铁路职业技术学院学报》2016年第1期28-31,共4页Journal of Xi’an Railway Vocational & Technical Institute
摘 要:对胡麻岭隧道第三系富水粉细砂地层特性进行分析论述,提出了洞内综合降水技术,达到了降低围岩含水率、控制围岩变形的效果,解决了围岩受施工扰动和水长期浸润后开挖时不稳定问题,保证了隧道结构和施工安全,为同等或类似地质条件下的地下工程研究及施工提供借鉴和参考。In this paper, Humaling tunnel tertiary rich silty and fine sand strata characteristics are analyzed and discussed, and tunnel dewatering technology is proposed. The goal of reducing the effect of rock moisture content and control of the surrounding rock deformation has been achieved. The excavation instability problems that after construction disturbance and long - term water infiltration have been solved, therefore it eusures the safety of tunnel structure and construction, and provide references for underground engineering research and construction under the same or similar geological conditions.
关 键 词:富水粉细砂 液化 涌水涌砂 围岩稳定 综合降水 设计与施工
分 类 号:U455.4[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.47