检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:楚金伟[1] 陈伟民[1] 张良[1] 张晋寅[1] 周海滨[1]
机构地区:[1]中国南方电网超高压输电公司检修试验中心,广东广州510663
出 处:《广东电力》2016年第7期117-121,共5页Guangdong Electric Power
摘 要:针对某500 kV变电站在一个月内连续发生两次35 kV干式空心电抗器烧损故障的问题(出现故障的电抗器将被迫停运检修,影响到电力系统的无功功率的调节),通过多方面的分析,认为连续发生故障的电抗器存在绝缘薄弱点,在长期运行中受到热老化和操作过电压等综合因素的影响,演化为局部缺陷,并发展成匝间绝缘短路故障而导致电抗器本体起火烧损。建议从干式空心电抗器寿命周期的首尾两个节点采取管控措施,以提高其运行维护质量。In allusion to problems of twice burning faults of 35 kV dry air-core reactor in one month in 500 kV substation which causes forced shut-down and maintenance of the faulted reactor and affects reactive power regulation of the power system,this paper carries out extensive research analysis and considers there are weak points of insulation in the faulted reactor which may be evolved to partial defects by influence of some comprehensive factors such as thermal aging and switching over-voltage in long-term running,and finally develop into turn-to-turn insulation short-circuit faults causing burning faults.It suggests to adopt control measures in the beginning and the end nodes of life cycle of dry air-core reactor so as to improve operational maintenance qualities.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.249