检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张雄[1] 耿宇迪[1] 焦克波[1] 侯帆[1] 罗攀登[1]
机构地区:[1]中国石化西北油田分公司工程技术研究院,新疆乌鲁木齐830011
出 处:《石油钻探技术》2016年第4期82-87,共6页Petroleum Drilling Techniques
基 金:国家科技重大专项"缝洞型碳酸盐岩油藏高效酸压改造技术"(编号:2011ZX05014-006)资助
摘 要:针对塔河油田裸眼水平井"封隔器+滑套"分段酸压费用高、作业周期长、分段工艺复杂、分段工具可靠性低、工具留井后处理难度大等问题,通过"纤维+颗粒"复合暂堵代替"封隔器+滑套"分段,完成单段酸压后注入"纤维+颗粒"复合段塞,在裂缝端口架桥形成具有一定封堵强度的暂堵层,迫使裂缝从下一段起裂,实现无工具分段酸压。通过室内试验优选出耐温120℃的暂堵纤维,120℃下其在清水及盐酸中2h的溶解率小于40%,可保证持续暂堵效果,最终溶解率100%,不伤害储层;优化了纤维和颗粒的尺寸及质量分数,质量分数为1.0%-2.0%、长度为6-8mm的纤维+质量分数为0.5%、直径为1.0mm的颗粒其暂堵压力大于9MPa。该技术在塔河油田应用8井次,施工暂堵压力6.6-9.0MPa,单井改造后产能大幅度提高,施工费用降低,累计增油5.6×104 t。研究结果表明,水平井暂堵分段酸压技术无需分段工具,解决了塔河油田碳酸盐岩水平井酸压工具下入和后期处理困难等问题。During the course of multi-stage acid fracturing in open hole of horizontal wells in the Tahe Oilfield,"packer+slide sleeve"methods are featured with high operation costs,long working cycle,complicated stage fracturing,low reliability of relevant tools,difficult to handle the tools left in the hole etc.To eliminate these problems,"fiber+particles"composite temporary plugging operations have be used to replace the conventional"packer+slide sleeve"techniques.Upon completion of acid fracturing in a single interval,"fiber+particles"can be injected to generate barriers at opening of fracture,the crack initiation will be in the next section,hereby the sectional fracturing can be performed without staged tools.Through laboratory tests,the temporary plugging fibers with temperature resistance up to 120 ℃ have been deployed,its dissolution rate is below 40%in fresh water and hydrochloride acid under temperature of 120℃for two hours,which keeps satisfactory temporary plugging effect and has ultimate dissolution rate of100%,no damage to reservoir formations.Mass fractions of fibers and particle size were optimized,i.e.fiber length of 6-8mm with mass fraction of 1.0%-2.0%,particle size of 1.0mm with mass fraction of0.5%,temporary plugging pressures9 MPa.The techniques have been applied for 8times in the Tahe Oilfield,with initial plugging pressures of 6.6-9.0 MPa,the single well production capacity has been raised significantly,and operation cost lowered,cumulative increase of oil 5.6×104 t.Research results showed that temporary plugging and staged acid fracturing for horizontal wells did not require the staged tools,so it can eliminate the problem of running and pulling relevant tools that ever used in conventional operation in horizontal wells of carbonate formations in the Tahe Oilfield.
分 类 号:TE357.2[石油与天然气工程—油气田开发工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.148.233.130