检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘斌[1]
机构地区:[1]陕西省水利电力勘测设计研究院,陕西西安710001
出 处:《水资源与水工程学报》2016年第3期181-186,共6页Journal of Water Resources and Water Engineering
摘 要:通过水力学模型对三河口水利枢纽泄洪消能工体型进行了试验研究。结果表明:两底孔出口采用矩形不对称宽尾墩形成的窄缝体型,三表孔采用左、右表孔差动式齿坎与中表孔舌型鼻坎组合的优化方案具有表孔、底孔出口水舌上下分层、前后拉开、横向扩散的特点,从而改善了水垫塘内的水流流态,提高了消能效率,水垫塘底板所受动水冲击压力及脉动压力达到了设计要求。The experiment on the shape of energy dissipation for Shanhekou water control project was car- ried out by hydraulic model. The results show that the exits of two bottom outlet was designed into narrow slit shape of asymmetric rectangle flared gate pier, while the left and right upper outlet adopt the shapes of differential tooth bucket, and the middle upper outlet adopt tongue - typed flip bucket. The optimiza- tion scheme with surface and bottom outlet water tongue layering from top to bottom, before and after the open has the lateral diffusion characteristics, so as to improve the flow pattern of water cushion pool, and improve the efficiency of energy dissipation. The dynamic water impact pressure and fluctuating pressure which exerts on the bottom slab of water cushion pool reaches the design requirement..
关 键 词:底孔 表孔 差动式齿坎 消能工 水垫塘底板 冲击压力
分 类 号:TV653.4[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.191.190.40