检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国能源建设集团山西省电力勘测设计院有限公司,山西太原030001
出 处:《现代工业经济和信息化》2016年第14期27-29,31,共4页Modern Industrial Economy and Informationization
摘 要:介绍了以全寿命费用成本最小为优化目标的输电线路总体设计方案,针对工程特点,从路径选择优化、导线增容节能、地线运行方式、铁塔型式优化、基础创新及优化等方面进行论述分析,贯彻全寿命周期管理理念,达到建设安全可靠、先进适用、经济合理、资源节约、环境友好的输电线路。This paper describes the overall design scheme of transmission lines with the goal of minimizing the full life span cost.Aiming to characteristic of this project,it is analyzed and discussed from optimization of route selection,energy conservation and increasing capacity for wires,operating mode of ground lines,optimization of tower types,fundamental innovation and optimization,and implemented the concept of full life span cycle.In order to construct transmission lines with Therefore,lines can be constructed to safe and reliable,advanced and applicable,economical and reasonable,resource saving,and environment friendly transmission lines.
分 类 号:TM751[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117