遇水软化崩解泥岩顶板巷道超前预注浆加固技术  被引量:7

Pre-grouting Technology for Water Softening Disintegration Mudstone of Roof Roadway

在线阅读下载全文

作  者:王拓[1] 张兵[1] 苏亚峰[1] 

机构地区:[1]安徽理工大学煤矿安全高效开采省部共建教育部重点实验室,安徽淮南232001

出  处:《煤矿安全》2016年第8期94-97,共4页Safety in Coal Mines

基  金:安徽省高校拔尖人才资助项目(2014ZY284);安徽省自然科学基金资助项目(1508085JGD08)

摘  要:山西某矿10#煤泥岩顶板受上部采空区积水影响,10#+11#煤联合巷道部分在掘时出现顶板淋水崩解、严重冒顶现象。由于围岩的软化破碎和水对锚固的损伤,致使常规支护手段失效,为此在掘进前对巷道顶板围岩进行取芯勘探,若发现围岩有突水软化迹象,则对巷道顶板采取超前预注浆加固。通过对注浆孔布置、注浆参数、注浆工艺等进行理论分析和工业实践,再对堵水效果、围岩物理特性和位移量进行分析对比,结果表明,对遇水软化的泥岩顶板进行超前预注浆加固,可有效地堵截水源,加固泥岩顶板,提高围岩的整体稳定性,保证巷道安全快速掘进。Mudstone roof of 10#coal layer in a coal mine of Shanxi province is influenced by upper goaf water,and roof watering,disintegration and serious roof collapse occurred in the excavation process of 10#+ 11#united coal roadway.Due to rock crushing and water damage on the anchor,conventional support means are difficult to obtain a good supporting effect.So,advanced grouting technology is proposed for water softening mudstone if signs of water softening are found in rock by using coring exploration technology before heading.Theoretical analysis and industrial tests were made for the arrangement of holes,grouting parameters and grouting technique.According to the analysis of water blocking rate,physical and chemical properties of wall rock,rock displacement,the results showed that:advanced pre-grouting is effectively in intercepting water,reinforcing roof,improving the overall stability of the rock,and ensuring safe and fast roadway excavation.

关 键 词:预注浆 采空区积水 泥岩顶板 冒顶 围岩控制 

分 类 号:TD353[矿业工程—矿井建设]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象