检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]冀东油田公司勘探开发建设项目部,河北唐山063200 [2]渤海钻探油气井测试分公司,河北廊坊065007
出 处:《油气井测试》2016年第4期70-74,78,共5页Well Testing
摘 要:在冀东油田新井、试油井中,高温高压、大斜度井挤(注)灰封层施工中经常遇到"灰塞下沉、无灰塞、多次注灰试压不合格"等问题。而在高渗浅层封窜施工中,由于挤灰量较大,在高比重水泥浆重力作用下,压开储层"造缝",造成封窜过程中的层间窜通。针对过去两年冀东油田挤(注)灰封层施工失败原因进行深入剖析,从增加灰浆顶替效率、提高套管壁面灰塞胶结程度、改善水泥浆流动性、优化灰浆稠化时间等方面入手,探索制定出挤(注)灰封层工艺措施,从而提高一次挤(注)灰封层成功率。In recent years,to the new wells,oil test wells in Jidong oilfield,problems such as sinking of cement,no cement plug,ash test unqualified for many times are usually encountered during operation of squeeze cement to high temperature and high pressure or high angle wells. In the high permeability of shallow sealing channeling operation,because of the large amount of squeezed ashes,under the action of the heavy gravity ratio of mud,created 'seam ' by pressured reservoir results in interlayer channeling in the process of sealing channeling. To analyze failure thoroughly for squeeze( note) cement process during the past two years,and from'increase efficiency,improve the casing wall ash mortar replace degree of consolidation,improve cement slurry flow,optimization of mortar thickening time',and other aspects,squeeze( note) cement seal process measures has been explored developed so as to improve the success rate of a squeeze( note) ash at once time.
分 类 号:TE358[石油与天然气工程—油气田开发工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.205