检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:肖韵菲 唐涌涛 苏应斌[1] 王帅[1] 苏荣福[1] 张志国
机构地区:[1]中国核动力研究设计院核反应堆系统设计技术重点实验室,成都610213 [2]长江勘测规划设计研究院,武汉430010
出 处:《核动力工程》2016年第4期108-112,共5页Nuclear Power Engineering
摘 要:地下核电厂厂房以丘陵地区中等规模山体地形为基础,采用阶地平埋型式对核岛厂房进行总体布置设计。采用将核岛地下厂房布置在"L"型洞室中和将核岛地面厂房布置在山体边坡外侧的布置方案,在此基础上进行地下厂房设备运输及人员通道、管道及电气电缆连接通道,以及地面核岛厂房的总体布置概念设计。对常规地面核岛厂房置于地下后所产生的影响进行分析,认为地下核电厂核岛厂房布置方案合理可行。The underground nuclear power plant takes the medium scale mountain terrain in hilly ground as its base, and the general layout of the nuclear island building is of "Terrace horizontal buried" style. Based on the layout scheme that locating the underground building of the nuclear island in L cavern and the ground building on the outside of the massif slop, the concept design of the general layout of the ground building of nuclear island as well as the equipment transport and personnel access, pipe and electrical cable connecting access of the underground building is conducted. The consequence by putting the traditional ground nuclear buildings under the ground is analyzed, and the analysis show that the layout scheme of the nuclear island building of the underground nuclear power plant is reasonable and feasible.
分 类 号:TL48[核科学技术—核技术及应用]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28