检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王健一[1] 李金忠[1] 李军[2] 吴超[1] 祝令瑜[3]
机构地区:[1]中国电力科学研究院,北京市海淀区100192 [2]国网青海省电力公司检修公司,青海省西宁市810008 [3]电力设备电气绝缘国家重点实验室(西安交通大学),陕西省西安市710049
出 处:《中国电机工程学报》2016年第17期4786-4792,共7页Proceedings of the CSEE
摘 要:为了对世界上海拔最高的高原输电工程——青藏直流联网工程的主设备状态进行更为准确有效的评估,该文对高海拔环境对高压直流输电主设备运行的影响展开研究,提出高海拔直流输电设备状态评估参数的修正方法。从理论上分析了高海拔下外绝缘强度、散热能力、紫外辐射、昼夜温差等方面对设备的影响,并基于相关性分析筛选出了高海拔下所需要修正的状态量。根据国网的状态评价导则以及低海拔地区的大量运行经验,建立了考虑高海拔条件的主设备运行状态评价方法,对与海拔相关的状态量及其权系数进行了海拔修正。基于已建立的状态评价方法,建立了±400 k V青藏直流工程主设备远程评价体系。研究表明,海拔修正系数的引入能够有效提高高海拔地区直流输电设备状态评估的准确性。In order to make a more accurate and effective assessment of the status of the main equipment of the +400kV Qingzang HVDC project, which is the world's highest altitude transmission project, the impact of high altitude on the operation of HVDC equipment was studied, and the correction model of condition assessment of HVDC equipment was proposed. External insulation strength, heat-sinking capability, ultraviolet radiation, and temperature difference day and night in high altitude area were analyzed theoretically. The state parameters which need to be revised at high altitude were selected based on the correlation analysis. Referring to the Condition Evaluation Guide established by State Grid, the weight of the condition variables related to altitude was revised, and the evaluation method for HVDC equipment in high altitude area was proposed. The remote condition monitoring and operation condition evaluation system for primary equipment of +400kV Qingzang HVDC project was established in the mode of concentrated construction. It is demonstrated that the altitude correction factors can effectively improve the accuracy of condition assessment of HVDC equipment operation in high altitude.
分 类 号:TM85[电气工程—高电压与绝缘技术]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.172