检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]北京市房地产科学技术研究所,北京100021 [2]中勘冶金勘察设计研究院有限责任公司,河北保定071069
出 处:《山西建筑》2016年第25期207-208,共2页Shanxi Architecture
摘 要:以天津某应急池抗浮抗拔振动沉管灌注桩工程结算为例,探讨了沉管桩工程项目特征发生变化时,在原综合单价基础上间接套用增减单价或计算新的综合单价方法,并研究了饱和土层施工沉管桩时,以设计指定施工规范为依据,计算"超灌高度"的方法,使工程结算做到既最大限度地提高工程利润,又避免结算纠纷。Taking the anti-floating vibration tube-sinking cast-in-situ piles of some emergency pool as the example,the paper explores the indirect adoption of the increasing and decreasing single price or the new comprehensive single price method based on the formal comprehensive single price when the program of the sinking pile's characteristics change,and researches the method to calculate the"ultra-pile height"by referring to the design and formulation of the construction regulations in the construction of the sinking-pile at water-saturated construction,so as to improve the engineering benefits maximally and avoid the settlement disputes.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.112