检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]国网湖北省电力公司经济技术研究院,湖北武汉430077
出 处:《湖北电力》2016年第3期11-14,共4页Hubei Electric Power
摘 要:随着特高压电网全面建设投产,1 000/500/220 k V电磁环网将不断出现,对500/220 k V电磁环网开环提出了新的需求。本文着重对500/220 k V电磁环网开环的基本原则、主要开环方式以及开环方案制定步骤进行了阐述,并以鄂西北500/220 k V电磁环网为例,结合其现状及远景电网规划,对其实施逐步开环,在解决鄂西北电网存在的电磁环网运行风险的同时,将电网规划与开环策略统筹考虑,指导鄂西北电网的发展。With the completion of UHV power grid and the 1 000/500/220 k V electromagneticloop network will continue to appear, the urgency of breaking 500/220 k V electromagnetic loop net-work is more important. This article focuses on the basic principles of breaking up 500/220 k V elec-tromagnetic loop network, the main open-loop method and the steps of formulating open-loop plan.Taking 500/220 k V electromagnetic loop network of Northwestern Hubei as example, open-loop planwith present situation and planning is put forward. The open-loop plan will solve the risks of grid,connect the open-loop plan and the grid planning, and guide the development of the grid.
分 类 号:TM715[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222