陷落柱赋存特征对综放开采的影响分析  被引量:7

Impact Analysis of the Occurrence Characteristics of Collapse Column on Fully Mechanized Caving Mining

在线阅读下载全文

作  者:田昌盛 师皓宇[2] 

机构地区:[1]内蒙古伊泰集团,内蒙古鄂尔多斯170002 [2]华北科技学院安全工程学院,北京东燕郊101601

出  处:《华北科技学院学报》2016年第4期35-38,42,共5页Journal of North China Institute of Science and Technology

基  金:中央高校基本科研业务费资助(3142013100)

摘  要:本文根据直接推过、绕过陷落柱所产生的工程费用进行分析,建立了过陷落柱方案的比较方程;采用模糊数学综合评价的方法,对中煤平朔集团井工一矿X5和X7陷落柱进行模糊评价,并确定X5和X7陷落柱的通过方案。根据颗粒极配实验和岩土介质渗透实验结果,确定陷落柱内部需要化学浆加固,施工中采用了超前深孔注水泥水玻璃与架前注化学浆相结合的方式进行加固,取得较好效果。According to engineering cost of push through the collapse column and Bypass the collapse column, established comparison equation of Choosing collapse column scheme; Adopted fuzzy mathematics comprehensive evaluation method,Evaluated X5 and X7 collapse column in Pingshuo Coal Industry Company No. 1 Coal Mine, ultimately determined using the scheme of pushing through X5 and X7 collapse column. According to the result of particle distribution experiment and rock and soil permeability Experiment, determined rock and soil in the collapse column is weak water permeability, need to use chemical grouting reinforcement ; Actually, used 2 schemes is Pre - deep hole cementing water glass and injection of chemical pulp in the front of Hydraulic support to reinforce.

关 键 词:陷落柱 综放工作面 规模 模糊评价 

分 类 号:TD742[矿业工程—矿井通风与安全]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象