摘  要:通过对铁岭电厂协调控制系统的调试,最终要使其协调系统能够正常投入自动运行并满足运行要求。同时,也要确保协调系统的调节品质达到验收要求,要求有较强的抗扰动能力,并提高机组自动化水平。试验结果分析表明,协调系统各种控制方式的调节品质均达到了部颁标准要求,能够满足机组的安全稳定的运行要求,系统抗扰动能力较强。The purpose of the coordinated control system debugging of 5^# Unit in Tieling Power Plantis ultimately to achieve the coordination system can normally put into automatic operation mode and meet the operation requirements. At the same time,it is to ensure that the regulate quality of the coordinate system can meet the acceptance requirements with stronger disturbance rejection ability to improve the automation level. Analysis of the results showed that the qualities of the coordinate system with various control ways could meet the departmental standard and the requirements of the unit safe and stable operation, and the system possessed a strong disturbance rejection.

关 键 词:协调控制系统 调试 试验 调节品质 

分 类 号:TP273[自动化与计算机技术—检测技术与自动化装置]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象